
C_TPLM30_67 Exam Questions Get Updated [2022] with Correct Answers
Practice C_TPLM30_67 Questions With Certification guide Q&A from Training Expert ActualTorrent
C_TPLM30_67 Exam Certification Details:
| Level: | Associate |
| Cut Score: | 51% |
| Languages: | German, English |
| Exam: | 80 questions |
SAP C_TPLM30_67 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
NEW QUESTION 32
Which of the following steps must you perform to customize priorities for a maintenance order?
- A. Assign priorities to order types.
- B. Assign priorities to technical object master records.
- C. Assign a priority type to an order type.
- D. Assign a priority type to a technical object master record.
Answer: C
NEW QUESTION 33
In order costing configuration, for what is the allocation structure used?
- A. To allocate costs to a hierarchy of maintenance technical objects
- B. To determine the settlement receiving elements for costs debited to the order
- C. To provide a method of consolidating costs in the Plant Maintenance Information System
- D. To determine the cost elements that are allowed in the plant maintenance order
Answer: B
NEW QUESTION 34
An administrator wants to configure an SC Series array to use Virtual Port Mode. What is a requirement to accomplish this task?
- A. Activation license must be purchased and installed
- B. NPIV must be disabled on Fibre Channel switches
- C. I/O Controller cards must use a single-ID firmware version
- D. Fibre Channel switches must use a switched fabric topology
Answer: A
NEW QUESTION 35
Life cycle of External Procurement involves the following. Identify
There are 2 correct answers to this question.
Response:
- A. Define shutdown
- B. Cross-department execution
- C. Ensures employee's security
- D. Procuring external material
- E. Procuring external services
Answer: D,E
NEW QUESTION 36
What does the maintenance plan category determine?
- A. How maintenance call objects are generated for a due maintenance call
- B. The type of maintenance call object the system generates for a due maintenance call
- C. The type of technical object for the maintenance plan
- D. The grouping of similar maintenance plans together for reporting
Answer: B
NEW QUESTION 37
What does the cycle set sequence in a multiple-counter maintenance plan determine?
- A. The scheduling sequence of a maintenance item
- B. The operation sequence of a maintenance order
- C. The scheduling sequence for a group of maintenance plans
- D. The operation sequence of a task list
Answer: A
NEW QUESTION 38
Which of the following is a benefit of SAP Solution Manager?
- A. It enables central SAP NetWeaver Enterprise Search within all SAP systems.
- B. It reduces the cost of implementation and continuous improvement.
- C. It reduces the number of systems and operates only one central IT landscape.
- D. It provides common master data management within all SAP systems.
Answer: B
NEW QUESTION 39
Your customer wants to view a list of all planned materials in multiple maintenance orders with order status CRTD.
Which of the following standard reports can you use to find the information required?
There are 3 correct answers to this question.
Response:
- A. The operation list
- B. The order list
- C. The materials where-used report
- D. The material availability report
- E. The order and operation list
Answer: B,D,E
NEW QUESTION 40
What is the info cube dimensions?
- A. Controller
- B. Project analysis
- C. Message reader
- D. Functional location/equipment
- E. Maintenance
Answer: D
NEW QUESTION 41
For which purpose do you use the sequence number in a cycle set?
- A. To determine which strategy applies to each cycle.
- B. To sequence the operations in the task list assigned to a maintenance item.
- C. To assign a cycle set to the task list of a maintenance item.
- D. To assign the cycle set to a maintenance item.
Answer: D
NEW QUESTION 42
Your customer wants to subdivide the maintenance organization by production responsibility.
What do you use to designate the contact person for coordination between production and plant maintenance?
Please choose the correct answer.
Response:
- A. Production cost center
- B. Plant section
- C. Work center
- D. Controlling area
Answer: B
NEW QUESTION 43
When a user creates a notification or an order and enters a functional location as the reference object, you want the system to suggest the subordinate equipment automatically.
In addition to setting the reference object view in the order or the notification, what other settings must you make? (Choose two)
- A. Set the Equipment-Installation Allowed indicator in the Functional Location master data record.
- B. Set View Profiles for Technical Objects in Customizing.
- C. Set the Single Installation indicator in the equipment master data record.
- D. Set the Single Installation indicator in the Functional Location master data record.
Answer: A,D
NEW QUESTION 44
For what maintenance manager is responsible?
- A. Execute the planning process
- B. Multiple tasks
- C. None of the above
- D. Defining, controlling and triggering the budget planning process
Answer: D
NEW QUESTION 45
Your customer wants to settle costs of the refurbishment process to an inventory account.
What Customizing does the process require? (Choose two)
- A. Special control keys for use in refurbishment operations
- B. A specific settlement profile for the purpose of refurbishment
- C. A specific order type for refurbishment processing
- D. A specific notification type for refurbishment processing
Answer: B,C
NEW QUESTION 46
How can you maintain a distribution rule? (Choose two)
- A. Manually, after the business completion for the order
- B. Manually, prior to the first settlement
- C. Automatically, based on a combination of Customizing and object master data
- D. Automatically, according to value categories in the order
Answer: B,C
NEW QUESTION 47
Which scheduling parameter adjusts the cycle intervals of a maintenance strategy for each maintenance plan?
- A. The early and late tolerance
- B. The call horizon
- C. The cycle modification factor
- D. The early and late shift factors
Answer: C
NEW QUESTION 48
Your customer uses operating hours to execute a performance-based maintenance plan.
Which of the following data must you assign in the maintenance plan header?
- A. An order type for performance-based maintenance
- B. A technical object with a measuring point
- C. A task list for performance-based maintenance
- D. A cycle unit of measure with a corresponding characteristic from the measuring point
Answer: D
NEW QUESTION 49
When connecting directly to an SC7020 storage array using Dell Storage Manager Client, which host/IP address is entered into the login screen?
- A. Management IP address of the Storage Center
- B. Data Collector IP address of the Storage Center
- C. Bottom Storage Controller Management IP address
- D. Top Storage Controller Management IP address
Answer: B
Explanation:
Explanation/Reference: https://www.dell.com/storagehelp/dellstorageclient/2016R2/en-us/GUID-931D776E-64AC-4826- A20C-8988C94F2A9C.html
NEW QUESTION 50
What happens when you set the system status in a maintenance order to technically completed (TECO)?
(Choose two.)
- A. The system sets a deletion indicator for outstanding reservations.
- B. The system sets a deletion indicator for purchase orders assigned to the maintenance order.
- C. The system sets a deletion indicator for outstanding purchase requisitions.
- D. The system posts costs to the target account assignment.
Answer: A,C
NEW QUESTION 51
The following entries are possible in the command field (Choose five.):
- A. From SAP Easy Access: search_sap_menu
- B. ?SM04
- C. From SAP Easy Access: SM04
- D. /nsm04
- E. /nend
- F. /nex
Answer: A,C,D,E,F
NEW QUESTION 52
Your customer wants to subdivide the maintenance organization by production responsibility.
What do you use to designate the contact person for coordination between production and plant maintenance?
- A. Production cost center
- B. Plant section
- C. Work center
- D. Controlling area
Answer: B
NEW QUESTION 53
When is the latest possible point in time that you can create a settlement rule?
- A. After technical completion
- B. Before order release
- C. After order release
- D. Before technical completion
Answer: D
NEW QUESTION 54
A measurement document is the overall term used to describe in system.
Please choose the correct answer.
Response:
- A. Control panel.
- B. Data entered
- C. Material stored
- D. Task list
Answer: B
NEW QUESTION 55
What are the prerequisites for creating a capacity requirement in a maintenance order operation? (Choose two)
- A. The performing work center must have available capacity data.
- B. The performing work center must have a control key with the Determine Capacity Requirements indicator set.
- C. The operation must have a control key with the Determine Capacity Requirements indicator set.
- D. The numeric value for Work in the order operation must be greater than 0.
Answer: C,D
NEW QUESTION 56
Which rule applies to user status in orders and notifications?
Please choose the correct answer.
Response:
- A. Every user, regardless of assigned authorizations, can assign a user status.
- B. When a user status is flagged as an initial status, it overrides the initial system status CRTD.
- C. When you set a new user status with a status number, the previous user status with status number is deactivated.
- D. The user status in the notification can be copied into the order.
Answer: C
NEW QUESTION 57
......
Prepare Top SAP C_TPLM30_67 Exam Audio Study Guide Practice Questions Edition: https://www.actualtorrent.com/C_TPLM30_67-questions-answers.html