
Reliable SAP Certified Technology Specialist E_S4HCON2023 Dumps PDF Nov 23, 2025 Recently Updated Questions
Pass Your SAP E_S4HCON2023 Exam with Correct 82 Questions and Answers
NEW QUESTION # 15
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
- A. The end of the database migration
- B. The end of the business downtime
- C. The start of the business downtime
- D. The start of the Execution roadmap step
Answer: B
NEW QUESTION # 16
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
- A. Updating to SAP ECC 6.07 using DMO
- B. SAP S/4HANA conversion to SAP S/4HANA 1709
- C. Upgrading to SAP ECC 6.08 without using DMO
- D. Using DMO when applying Support Packages to SAP ECC 6.07
Answer: B,C
NEW QUESTION # 17
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
- A. AA
- B. A Standalone SAP system with ABAP 7.51 or above
- C. An SAP S4HANA 1709 sandbox system
Answer: B,C
NEW QUESTION # 18
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:
- A. The Application Guide
- B. The SAP S/HANA Conversion Guide
- C. The major SUM Guide
- D. The DMO Guide
Answer: B,D
NEW QUESTION # 19
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
NEW QUESTION # 20
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:
- A. To repeat specific phases during the SUM run
- B. To auto-fill specific fields on selected screens on the SUM UI
- C. To make the progress information within SUM UI more accurate
- D. To skip selected phases during the SUM run
Answer: C
NEW QUESTION # 21
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.
- A. The source system is non-Unicode and the target database is a scale-out system.
- B. SAP HANA Landscape Reorganization required a manual step to edit a file.
- C. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
- D. The target database size increases temporarily because of the Shadow Repository.
- E. Network capacity between exporting and importing R3load processes must be.
Answer: B,C
NEW QUESTION # 22
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. SAP Solution Manager 7.2
- B. SAP S/4HANA Server 1809 and above
- C. Standalone AS ABAP with SAP_BASIS 752 and above
- D. SAP ECC system from SAP ERP 6.0 EHP 8
Answer: B,C
NEW QUESTION # 23
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
- A. Apply the recommendations of the simplification list
- B. Perform the migration of data into the new data structure
- C. Run the database migration to the SAP HANA database
- D. Check the compatibility of custom code with SAP S/4HANA
Answer: A,D
NEW QUESTION # 24
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
- A. Downtime migration
- B. Silent data migration (SDM)
- C. Downtime conversion
- D. Shadow on target creation
Answer: A
NEW QUESTION # 25
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
- A. The corrections to the SUM Guide
- B. AA
- C. The link to different patch levels to SUM
- D. An overview about possible upgrade paths
Answer: A,C,D
NEW QUESTION # 26
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
- A. Software update
- B. Main import
- C. Migration
- D. Conversion
Answer: C,D
NEW QUESTION # 27
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question
- A. TABIM_SHADOW_*
- B. PARMVNT_UPG
- C. PARDIST_SHD
- D. TABIMJJPG
Answer: D
NEW QUESTION # 28
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A. The SI checks are executed in the development system and the results are transported into the subsequent systems.
- B. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
- C. You need to build up a SI check framework by applying SAP notes.
- D. Depending on the SAP S/4HANA version, there are different SI check frameworks.
Answer: C,D
NEW QUESTION # 29
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. At the end of the downtime
- B. As part of the cleanup process
- C. Early in the downtime
- D. Before the downtime starts
Answer: D
NEW QUESTION # 30
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.
- A. Support Package Stack update
- B. Dual Stack split
- C. Release upgrade
- D. Database migration
- E. Homogenous system copy
Answer: A,C,D
NEW QUESTION # 31
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
- A. Phase RUN_RSDBSCPY
- B. Phase RUN_RSPTBFIL _ISUTABU
- C. Phases DIFF*
- D. Phase DOWNCONF_DTTRANS
- E. Phases EU_IMPORT*
Answer: C,D,E
NEW QUESTION # 32
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In DMO Migration Preparation
- B. In Process Control Center
- C. In SUM Parameters
- D. In SUM Phaselist
Answer: B,C
NEW QUESTION # 33
......
SAP E_S4HCON2023 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
Latest 2025 Realistic Verified E_S4HCON2023 Dumps: https://www.actualtorrent.com/E_S4HCON2023-questions-answers.html
Pass E_S4HCON2023 Exam Updated 82 Questions: https://drive.google.com/open?id=1vlE6OS8e28aDkfhci5JT4Zor7_xd8Zjj